About us   |   Residential Projects   |   Commercial Projects   |   Awards   |   News & Events   |   FAQs   |   Careers   |   Contact us   |   Sitemap   |   Home
 
Residential Projects - Ongoing
 
Park Turquoise, Wakad
2, 2.5 & 3 BHK Apartments    
  Amenities
  • Security/Entrance lobbies:
DID Telephone exchange system. Secure, enclosed entrance lobbies to all buildings with reception and waiting area for visitors.

• Car Parking
150% car parking facility including visitors parking

• Generator:
All common areas/facilities such as elevators, Clubhouse, pumps with fully automatic generator backup

• LPG:
LPG reticulated systems in the kitchen

• Garbage Disposal:
Garbage Chute will be provided for each building

• Fire fighting:
Fire fighting facilities/provision as required by law.
Fire extinguisher in lobbies on all floors.

• Rain Water Harvesting:
Rainwater harvesting/storage/recharging underground water system to efficiently harness rainwater

• Sewage treatment:
Sewage treatment plant for entire project with ability to reuse the recycled water for landscaping and flushing.

• Elevators:
Each apartment building with two automatic elevators. All elevators come with an inbuilt safety mechanism that will bring down the elevator to the nearest floor in case of power failure.

• Landscaping:
Ample landscaped/open areas, walking/jogging tracks, play areas for children, relaxation spaces, and party areas.

• Club House:
Earmarked spaces for table tennis, pool/billiards, cards, etc.
Encompasses a well equipped air conditioned gymnasium, multipurpose hall, full sized swimming pool and children’s play pool.
Introduction
Layout
Floor Plans
Amenities
Specification
Area Statement
Download e-brochure
Location
Site Progress
Enquiry
Top